Hardwood flooring installation

Hardwood Flooring Installation


The installation process for hardwood flooring involves several steps to ensure the flooring is properly laid and will last for years. Here’s a general guide:
 

1. Preparation

 
  • Acclimation: Hardwood planks need to acclimate to the room’s temperature and humidity. This usually takes 3-5 days. The wood should be stored flat in the room where it will be installed.
  • Subfloor Preparation: The subfloor (typically plywood or concrete) must be clean, dry, level, and structurally sound. If necessary, repair any damage or level the subfloor.
  • Moisture Testing: Check the moisture levels of both the subfloor and hardwood to prevent future warping or gaps. Use a moisture meter for accuracy.
  • Gather Tools and Materials: This includes a tape measure, chalk line, nailer or stapler, mallet, saw, underlayment (if needed), and spacers.
 

2. Layout Planning

 
  • Measure and Mark: Measure the room and determine the layout of the boards. Ideally, start along the longest, straightest wall, usually an exterior wall. Use a chalk line to ensure the first row is straight.
  • Expansion Gap: Leave a 1/4 to 1/2 inch gap between the flooring and the wall to allow for expansion due to humidity changes.
 

Request a free estimate

Estimate

* *
*
*

3. Installation Methods

 
  • Nail Down: Common for solid hardwood. Planks are nailed into the subfloor. Typically, a pneumatic nailer is used.
  • Staple Down: Similar to nail-down but uses staples instead of nails.
  • Glue Down: Used for engineered hardwood or on concrete subfloors. Adhesive is spread on the subfloor, and the planks are pressed into place.
  • Floating: Engineered hardwood or click-lock flooring is snapped together and “floats” over the subfloor with an underlayment in between. This method doesn’t require nails or glue.
 

4. Laying the Floor

 
  • First Row: Lay the first row of planks along the chalk line, ensuring it’s straight and aligned. Nail, staple, or glue as required.
  • Subsequent Rows: Stagger the joints by at least 6 inches to enhance stability and aesthetics. Use a tapping block to gently tap each row into place.
  • Cutting: Use a saw to cut the end pieces to fit, ensuring the end joints are staggered from row to row.
  • Final Rows: The last row may require cutting the planks lengthwise to fit. Use a pry bar to fit the final row snugly.
Hardwood flooring installation available in Waukesha, WI from My New Floors Inc.

5. Finishing Touches

  • Install Trim: Install baseboards or shoe molding to cover the expansion gap around the room's perimeter.
  • Clean Up: Remove any debris and dust. Clean the floor according to the manufacturer’s instructions, typically with a hardwood-safe cleaner.
 

6. Post-Installation Care

  • Let the Floor Settle: Allow the floor to settle for a few days before placing heavy furniture on it.
  • Maintenance: Regularly clean with a dry or slightly damp mop. Avoid excessive water, which can damage the wood.